These are general upgrade instructions for Vault for both non-HA and HA setups. Please ensure that you also read any version-specific upgrade notes which can be found in the sidebar.
IMPORTANT NOTE: Always back up your data before upgrading! Vault does not make backward-compatibility guarantees for its data store. Simply replacing the newly-installed Vault binary with the previous version will not cleanly downgrade Vault, as upgrades may perform changes to the underlying data structure that make the data incompatible with a downgrade. If you need to roll back to a previous version of Vault, you should roll back your data store as well.
Learn
Refer to the Vault Upgrade Standard Procedure guide for step-by-step examples of upgrading Vault Enterprise.
Testing the Upgrade
It's always a good idea to try to ensure that the upgrade will be successful in your environment. The ideal way to do this is to take a snapshot of your data and load it into a test cluster. However, if you are issuing secrets to third party resources (cloud credentials, database credentials, etc.) ensure that you do not allow external network connectivity during testing, in case credentials expire. This prevents the test cluster from trying to revoke these resources along with the non-test cluster.
OSS to Enterprise Installations
Upgrading to Vault Enterprise installations follow the same steps as OSS upgrades except that the Vault Enterprise binary is to be used and the license file applied, when applicable. The Enterprise binary and license file can be obtained through your HashiCorp sales team.
Non-HA Installations
Upgrading non-HA installations of Vault is as simple as replacing the Vault binary with the new version and restarting Vault. Any upgrade tasks that can be performed for you will be taken care of when Vault is unsealed.
Always use SIGINT
or SIGTERM
to properly shut down Vault.
Be sure to also read and follow any instructions in the version-specific upgrade notes.
HA Installations
This is our recommended upgrade procedure, and the procedure we use internally at HashiCorp. However, you should consider how to apply these steps to your particular setup since HA setups can differ on whether a load balancer is in use, what addresses clients are being given to connect to Vault (standby + leader, leader-only, or discovered via service discovery), etc.
Whatever method you use, you should ensure that you never fail over from a newer version of Vault to an older version. Our suggested procedure is designed to prevent this.
Please note that Vault does not support true zero-downtime upgrades, but with proper upgrade procedure the downtime should be very short (a few hundred milliseconds to a second depending on how the speed of access to the storage backend).
Perform these steps on each standby:
- Properly shut down Vault on the standby node via
SIGINT
orSIGTERM
- Replace the Vault binary with the new version; ensure that
mlock()
capability is added to the new binary with setcap - Start the standby node
- Unseal the standby node
- Verify
vault status
shows correct Version and HA Mode isstandby
- Review the node's logs to ensure successful startup and unseal
At this point all standby nodes will be upgraded and ready to take over. The upgrade will not be complete until one of the upgraded standby nodes takes over active duty. To do this:
Properly shut down the remaining (active) node
Note: It is important that you shut the node down properly. This will perform a step-down and release the HA lock, allowing a standby node to take over with a very short delay. If you kill Vault without letting it release the lock, a standby node will not be able to take over until the lock's timeout period has expired. This is backend-specific but could be ten seconds or more.
Replace the Vault binary with the new version; ensure that
mlock()
capability is added to the new binary with setcapStart the node
Unseal the node
Verify
vault status
shows correct Version and HA Mode isstandby
Review the node's logs to ensure successful startup and unseal
Internal upgrade tasks will happen after one of the upgraded standby nodes takes over active duty.
Be sure to also read and follow any instructions in the version-specific upgrade notes.
Replication Installations
Note: Prior to any upgrade, be sure to also read and follow any instructions in the version-specific upgrade notes which are found in the navigation menu for this documentation.
Upgrading installations of Vault which participate in Enterprise Replication requires the following basic order of operations:
- Upgrade the replication secondary instances first using appropriate guidance from the previous sections depending on whether each secondary instance is Non-HA or HA
- Verify functionality of each secondary instance after upgrading
- When satisfied with functionality of upgraded secondary instances, upgrade the primary instance
Upgrades of multiple replicated clusters can be complicated. Here is an example.
In the above scenario, the ideal upgrade procedure would be as follows, verifying functionality after each cluster upgrade.
- Upgrade Clusters B and D, using the HA upgrade process above. These clusters have no downstream clusters, so they should be upgraded first, but the ordering of B vs D does not matter.
- Upgrade Cluster C, which now has an upgraded downstream cluster (Cluster D). Because Cluster C is a cluster, it should also use the HA upgrade process.
- Finally, upgrade Cluster A. All clusters downstream of A will already be upgraded. It should be upgraded last, as it is a Performance Primary and a DR Primary.